Thursday, May 2, 2019
Construction method statement and risk assessment Research Proposal
Construction method statement and risk assessment - explore Proposal ExampleThe study will also measure the impact on river life. Steps slew be taken to reduce negative impact by designing the diversion channel to take features.1. Installation of welfare and sanitary facilities for workers on site.Risk assessment at this stageAssessment of risks including fiscal risks associated with a cost plus contract, ecological risks, and competency risks associated with improper / insufficient training.The sequence of execution for the visualiseSetting out of the channel according to the design, including the location of the foot over bridge, and access and surrounding development. city block of area around start and end of diversion on river bed by creating rock levy. That shall be extended later to block the river.1. Excavation of the diversion channel to rig depth and dimensions.Pouring discernible concrete at bottom of diversion channel, and spray concrete along sides.2. 3. Reinforcem ent and shuttering for sides and bottom of channel.4. Shuttering and formwork with correct alignment and levels.Poring of concrete into formwork, and vibration to reduce air pockets within poured concrete.5. Pouring and installation of foot overbridge use a 4 bag mixer (assuming channel width of approximately 10m).Surrounding development including walkways, woodlet and safety / guardrails.Installation of lighting as required.Installation of metal ladders and other safety features to diversion channel. house painting of levels on channel sides.Provision of monitoring office to oversee operation during defect liability period. carry testing.Commissioning.Blocking of existing riverbed at both ends.Apart from Health and safety issues as enumerated above, work with or in water involves risks arising due to the followingWater stagnation or flow.Fluctuation in levels and flow rates, either seasonal or daily.Tides, in case of proximity to see.Weather changes, including rain in upriver cat chment areas.Diseases.Other users of water including boats, people, structures.Impact on plant and animal life.Some other cosmopolitan measures to mitigate health and safety risks for the project areFlood warning system and foghorn.Public organise system.Constantly available means of escape and evacuation for workers on site.Access to weather information in real-time.Study of soil
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.